Untitled Document
Untitled Document
ABOUT US COMPANY PROFILE COMPLETED PROJECTS OFFICE FACILITIES ABBREVIATION
Untitled Document
 
Building Projects|Power|Irrigation|Transportation|Water Supply|Sanitation|Water Resources| Institution|Environment|Survey|Technical
 
 
 
 
    Selected Sample Projects  
 
Sn Name of Projects Type of Work Client Completion Year
1 Inland Navigation Studies for Karnali (Chisapani) Multipurpose Project Feasibility Study HPC 1987
2 Irrigation Field Studies for Karnali (Chisapani) Multipurpose Project Field Study HPC 1987
3 Flood & Damage Studies for Karnali (Chisapani ) Multipurpose Project Field Study HPC 1988
4 Water Inventory Study in Myagdi District Inventory Study WECS/WISP 1992
5 Water Inventory Study in Sanskhuwasabha District Inventory Study WECS 1993
6 Khotang Small Hydro Power Project in Khotang District (2300 Kw) Technical Feasibility SHPD 1993
7 Naugarh Gad Small Hydropower Project in Darchula District Feasibility Study SHMP/NEA 1995
8 Kali Gandaki ‘A’ Hydroelectric Project (144 MW), Western Development Region (AS local associate to Morrison Knudsen International Inc., USA) Design & Construction Supervision NEA/ADB/OECF Japan 2002
9 Preparation of Standards for Study of Hydropower Project (JV with East Consult & Hydro Engineering Services [P] Ltd.) Preparation of Technical Standards Department of Electricity Development 2002
 
Untitled Document
  © Nepalconsult (P) .Ltd. All Rights Reserved 2007 Designed & Powered By: Everest Net Pvt. Ltd.